Home | About Us | Contact Us  
 
 
 
CBI Back

Project:
EGLNG Train 1, Bioko Island, Equatorial Guinea

Consultant:
Bechtel

Location:
Malabo, Equatorial Guinea

Date of Completion:
November ‘ 06

Project Brief:
Installation, testing and commissioning for 2 nos 136,000 m3 double - walled LNG storage   tanks:

Instrumentation Systems including:
Whessoe Tank Ganging System for Tank Inventory Management
Field Instruments for Tank Ganging System
Allen Bradley Control Logix PLC based Fire & Gas System with general Monitors field   devices.

Electrical Systems including:
Tank Lighting
Foundation Heating System with control room monitoring facility

 
 
 
 
 
  Copyright © 2006 Global Design & Engineering Services.  
Designed & Developed By: www.turningpoint-me.com